Monday 5 February 2018 – Plumbing!

Plumbing was done today, and someone left the door unlocked so I got to go inside!!!  I was rushed, because I was on the way to take my daughter to swimming lessons and was only expecting to be able to have a look through the windows, so I was running around the house like an…

Advertisements

Saturday 13 January 2018 – Tiles

Tilers have been at our build the last two days laying our tiles.  They haven't been grouted yet.   The floor tiles are Haven Linen from Beaumont Tiles and are 450x450. Also noticed that our render has been chipped.  

Thursday 16 November 2017 – Cabinets done

All cabinetry is done.  And I love them even more now than I did when I first saw them.   All the doors and architrave and door hinges and stuff has also been delivered.   I has rained quite heavily all day and the alfresco downpipe is still unconnected.  There'a a helluva lotta water!  …