Wednesday 28 March 2018 – PCI Day!

Today was our long awaited PCI day.  It started with Mr W meeting with the Construction Manager and the Site Supervisor at 8:30.  I was late - had to do Kinder drop off.  We were there with Bentley until about 11am.  Darbecca arrived at 10:30 to do their Inspection and he left at about 12.…

Advertisements

Wednesday 27 September 2017 – Downpipes

We have downpipes,  permanent ones.  But they aren't connected to the stormwater, just hanging there, directing the rainwater to pool at the base of the slab.  FFS, we've been through this.   And the rear downpipe by the alfresco is just hanging there because the bricks have been removed as they needed to be replaced. …

Sunday 17 September 2017 – Insulation

We sent the Pre-Plaster report to the builder yesterday and formally requested that all defects be fixed and that we have another inspection prior to plaster being installed.  This is going to set us back, but it's more important that the house is built properly.  We've also questioned the validity of the formal frame approval…