Monday 21 August 2017 – Roof Roof

Either last Friday or early Saturday, we had some timber put on our roof in readiness for the tiling.  All the roof tiles are in the foreground on pallets.   This morning, Mr W, stopped by on his way to work to find the roofers laying the roof tiles, and he sent me this photo...…

Sunday 23 July 2017 – Our slab

Family day out yesterday was to look at our slab.  Now that the slab is done we can get a real feel for the size of the backyard, which is just about perfect.  I should've taken some photos, maybe next time.   They have tidied up the site and levelled out some dirt.  The below…

Friday 14 July 2017 – Pre Pour Inspection

We had Darbecca do our Pre Pour Inspection today.   There are 11 defects, and if we didn't have an inspector, they would possibly be overlooked.   The defects are: 1. The earthing facility installed to the dwellings slab steel as required in AS 3000 has not been installed. This dwelling has formed shower bases…

Monday 10 July 2017 – Drainage

We have pipes!  Drainage works started today, and more work for slab prep will continue this week in preparation for SLAB POUR on Tuesday 18 July.   I went late in the day and the light was fading, but you can't miss those pipes!   And to the left of the second picture, you can…